Offering levels of new technical capacities

Offering levels

The TSOs are currently planning to offer the following offering levels for new technical capacities in the 2017 annual auction on the primary capacity platform PRISMA. The specified capacity levels include the current reservation quotas for short-term capacity marketing prescribed under the NC CAM and KARLA Gas. The reservation quota for a period of up to five years is 10% and 20% thereafter.

The new technical capacities earmarked for short-term marketing in accordance with the NC CAM and Karla Gas will be offered accordingly as quarterly products in later auctions. The TSOs reserve the right, if applicable, to adjust the capacity offering for new technical capacities in the 2017 annual auction, depending on the level of the concluded preliminary agreements.

Network point ENTRY Greifswald-NEL

Transmission system operator: Fluxys Deutschland GmbH

Degree of capacity allocation: 100%

For the period 1 October 2019 – 1 October 2022, a total of 1,417,984 kWh/h will be offered in the only offering level as dynamically allocable capacity (dac) with an allocation restriction.

For the period 1 October 2022 – 1 October 2044, a total of 1,260,431 kWh/h will be offered in the only offering level as dac with an allocation restriction.

Transmission system operator: Gasunie Deutschland Transport Services GmbH

Degree of capacity allocation: 75%

For the period 1 October 2019 – 1 October 2022, a total of 1,467,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl.

For the period 1 October 2022 – 1 October 2044, a total of 1,304,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl.

Transmission system operator: NEL Gastransport GmbH

Degree of capacity allocation: 98%

For the period 1 October 2019 – 1 October 2022, a total of 3,029,400 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 327,990  kWh/h dac at the network points EXIT Bunde or Drohne;
  • 2,701,410  kWh/h dac at the network points EXIT Bunde, Drohne or Zone Oude Statenzijl.

For the period 1 October 2022 – 1 October 2044, a total of 2,692,800 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 291,546  kWh/h dac at the network points EXIT Bunde or Drohne;
  • 2,401,254  kWh/h dac at the network points EXIT Bunde, Drohne or Zone Oude Statenzijl.

New network point ENTRY Vierow

Transmission system operator: GASCADE Gastransport GmbH

Degree of capacity allocation: 98%

For the period 1 October 2019 – 1 October 2020, a total of 36,091,507 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 24,931,507 kWh/h dac at the network point EXIT Deutschneudorf-EUGAL;
  • 4,958,490  kWh/h dac at the network points EXIT Bunde or Drohne;
  • 6,201,510  kWh/h dac at the network points EXIT Bunde, Drohne or Zone Oude Statenzijl.

For the period 1 October 2020 – 1 October 2022, a total of 71,232,877 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 40,646,376 kWh/h dac at the network point EXIT Deutschneudorf-EUGAL; 10,681,200 kWh/h dac at the network points EXIT Bunde / Drohne;
  • 6,529,500  kWh/h dac at the network points EXIT Deutschneudorf-EUGAL, Bunde, Drohne or Zone Oude Statenzijl;
  • 1,800,000 kWh/h dac at the network point EXIT Deutschneudorf;
  • 3,960,000 kWh/h dac at the network point EXIT Deutschneudorf or Deutschneudorf-EUGAL;
  • 7,615,801 kWh/h dac at the network point EXIT Olbernhau II.

For the period 1 October 2022 – 1 October 2044, a total of 63,318,113 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 36,130,112 kWh/h dac at the network point EXIT Deutschneudorf-EUGAL; 
  • 9,494,400  kWh/h dac at the network points EXIT Bunde or Drohne;
  • 5,804,000  kWh/h dac at the network points EXIT Deutschneudorf-EUGAL, Bunde, Drohne or Zone Oude Statenzijl;
  • 1,600,000 kWh/h dac at the network point EXIT Deutschneudorf;
  • 3,520,000 kWh/h dac at the network point EXIT Deutschneudorf or Deutschneudorf-EUGAL;
  • 6,769,601 kWh/h dac at the network point EXIT Olbernhau II.

Transmission system operator: Gasunie Deutschland Transport Services GmbH

Degree of capacity allocation: 75%

For the period 1 October 2019 – 1 October 2022, a total of 2,830,500 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl.

For the period 1 October 2022 – 1 October 2044, a total of 2,516,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl.

Transmission system operator: Fluxys Deutschland GmbH

As things currently stand, Fluxys Deutschland GmbH likewise intends to offer capacities at the network point Vierow. A decision on whether these capacities can be offered has yet to be made.

Possible amount to be offered: 2,983,975 kWh/h

Degree of capacity allocation: 100%

For the period 1 October 2019 – 1 October 2022, a total of 2,685,577 kWh/h is to be offered in the only offering level as dac with an allocation restriction.

For the period 1 October 2022 – 1 October 2044, a total of 2,387,180 kWh/h is to be offered in the only offering level as dac with an allocation restriction.

Network point ENTRY GCP GAZ-SYSTEM/ONTRAS

Transmission system operator: ONTRAS Gastransport GmbH

Degree of capacity allocation: 30%

For the period 1 October 2020 – 1 October 2022, a total of 1,642,500 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

For the period 1 October 2022 – 1 October 2032, a total of 1,460,000 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

Network point EXIT Deutschneudorf

Transmission system operator: ONTRAS Gastransport GmbH

Degree of capacity allocation: 100%

For the period 1 October 2019 – 1 October 2022, a total of 1,800,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point ENTRY Vierow or Mallnow.

For the period 1 October 2022 – 1 October 2044, a total of 1,600,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point ENTRY Vierow or Mallnow.

Network point EXIT GCP GAZ-SYSTEM/ONTRAS

Transmission system operator: ONTRAS Gastransport GmbH

Degree of capacity allocation: 30%

For the period 1 October 2019 – 1 October 2022, a total of 602,100 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

For the period 1 October 2022 – 1 October 2032, a total of 535,200 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

New network point EXIT Deutschneudorf-EUGAL

Transmission system operator: GASCADE Gastransport GmbH

Offering level I

Degree of capacity allocation: 98%

For the period 1 October 2019 – 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

For the period 1 October 2020 – 1 October 2022, a total of 40,643,099 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

For the period 1 October 2022 – 1 October 2044, a total of 36,127,199 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

Offering level II

Degree of capacity allocation: 97%

For the period 1 October 2019 – 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

For the period 1 October 2020 – 1 October 2022, a total of 47,172,599 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

For the period 1 October 2022 – 1 October 2044, a total of 41,931,199 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

Offering level III

Degree of capacity allocation: 96%

For the period 1 October 2019 – 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

For the period 1 October 2020 – 1 October 2022, a total of 51,132,599 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

For the period 1 October 2022 – 1 October 2044, a total of 45,451,199 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Vierow.

Network point EXIT Mallnow

Transmission system operator: GASCADE Gastransport

Offering level I

Degree of capacity allocation: 20%

For the period 1 October 2019 – 1 October 2022, a total of 3,859,200 kWh/h will be offered as fac;

For the period 1 October 2022 – 1 October 2032, a total of 3,430,400 kWh/h will be offered as fac.

Offering level II

Degree of capacity allocation: 30%

For the period 1 October 2019 – 1 October 2022, a total of 5,657,400 kWh/h will be offered as fac;

For the period 1 October 2022 – 1 October 2032, a total of 5,028,800 kWh/h will be offered as fac.

Offering level III

Degree of capacity allocation: 45%

For the period 1 October 2019 – 1 October 2022, a total of 12,592,800 kWh/h will be offered as fac;

For the period 1 October 2022 – 1 October 2032, a total of 11,193,600 kWh/h will be offered as fac.

Zone EXIT Oude Statenzijl

Transmission system operator: Gasunie Deutschland Transport Services GmbH

Degree of capacity allocation: 50%

For the period 1 October 2019 – 1 October 2022, a total of 10,800,000 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

For the period 1 October 2022 – 1 October 2044, a total of 9,600,000 kWh/h will be offered in the only offering level as freely allocable capacity (fac).