The TSOs are currently planning to offer the following offering levels for new technical capacities in the 2017 annual auction on the primary capacity platform PRISMA. The specified capacity levels include the current reservation quotas for short-term capacity marketing prescribed under the NC CAM and KARLA Gas. The reservation quota for a period of up to five years is 10% and 20% thereafter.

The new technical capacities earmarked for short-term marketing in accordance with the NC CAM and Karla Gas will be offered accordingly as quarterly products in later auctions. 

The offering levels of individual TSOs presented here in the following are also available in tabular form in an Excel files:

You can find an overview of existing capacities to be fully booked. 

Network point ENTRY Greifswald-NEL

Transmission system operator: Fluxys Deutschland GmbH

For the period 1 October 2019 to 1 October 2022, a total of 1,417,984 kWh/h will be offered in the only offering level for new technical capacities as dynamically allocable capacity (dac) with an allocation restriction.

For the period 1 October 2022 to 1 October 2044, a total of 1,260,431 kWh/h will be offered in the only offering level for new technical capacities as dac with an allocation restriction.

The degree of capacity allocation for new technical capacities is 100%.

In addition to the offer for new technical capacities, free existing capacities of 710,600 kWh/h for the period 1 October 2017 to 1 October 2022 and 27,471 kWh/h for the period 1 October 2022 to 1 October 2032 will be offered as dac. More information on the different capacity types can be found at: http://www.fluxys.com/nel/de

Transmission system operator: Gasunie Deutschland Transport Services GmbH

Degree of capacity allocation: 75%

For the period 1 October 2019 to 1 October 2022, a total of 1,470,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl and at all other exits in the GUD network.

For the period 1 October 2022 to 1 October 2044, a total of 1,306,666 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl and at all other exits in the GUD network.

Transmission system operator: NEL Gastransport GmbH

Degree of capacity allocation: 98%

For the period 1 October 2019 to 1 October 2022, a total of 3,029,400 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 327,990 kWh/h dac at the network points EXIT Bunde or Drohne;
  • 2,701,410 kWh/h dac  at the network points EXIT Bunde, Drohne or Zone Oude Statenzijl.

For the period 1 October 2022 to 1 October 2039, a total of 2,692,800 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 291,546 kWh/h dac at the network points EXIT Bunde or Drohne;
  • 2,401,254 kWh/h dac at the network points EXIT Bunde, Drohne or Zone Oude Statenzijl.

New network point ENTRY Lubmin II

Transmission system operator: GASCADE Gastransport GmbH

Degree of capacity allocation: 89%

For the period 1 October 2019 to 1 October 2020, a total of 36,091,507 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 24,931,507 kWh/h dac at the network point EXIT Deutschneudorf-EUGAL;
  • 4,958,490 kWh/h dac at the network points EXIT Bunde or Drohne;
  • 6,201,510 kWh/h dac at the network points EXIT Bunde, Drohne or Zone Oude Statenzijl.

For the period 1 October 2020 to 1 October 2022, a total of 71,232,877 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 40,646,376 kWh/h dac at the network point EXIT Deutschneudorf-EUGAL;
  • 10,681,200 kWh/h dac at the network points EXIT Bunde / Drohne;
  • 6,529,500 kWh/h dac at the network points EXIT Deutschneudorf-EUGAL, Bunde, Drohne or Zone Oude Statenzijl;
  • 1,800,000 kWh/h dac at the network point EXIT Deutschneudorf or Deutschneudorf_NEW_HSK1;
  • 3,960,000 kWh/h dac at the network point EXIT Deutschneudorf or Deutschneudorf-EUGAL;
  • 7,615,801 kWh/h dac at the network point EXIT Olbernhau II.

For the period 1 October 2022 to 1 October 2039, a total of 63,318,113 kWh/h will be offered in the only offering level as dac with the following allocation restrictions:

  • 36,130,112 kWh/h dac at the network point EXIT Deutschneudorf-EUGAL; 
  • 9,494,400 kWh/h dac at the network points EXIT Bunde or Drohne;
  • 5,804,000 kWh/h dac at the network points EXIT Deutschneudorf-EUGAL, Bunde, Drohne or Zone Oude Statenzijl;
  • 1,600,000 kWh/h dac at the network point EXIT Deutschneudorf or Deutschneudorf_NEW_HSK1;
  • 3,520,000 kWh/h dac at the network point EXIT Deutschneudorf or Deutschneudorf-EUGAL;
  • 6,769,601 kWh/h dac at the network point EXIT Olbernhau II.

New network point ENTRY Vierow

Transmission system operator: Gasunie Deutschland Transport Services GmbH

Degree of capacity allocation: 75%

For the period 1 October 2019 to 1 October 2022, a total of 2,830,500 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl and at all other exits in the GUD network.

For the period 1 October 2022 to 1 October 2044, a total of 2,516,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point EXIT Zone Oude Statenzijl and at all other exits in the GUD network.

Transmission system operator: Fluxys Deutschland GmbH

Degree of capacity allocation: 100%

For the period 1 October 2019 to 1 October 2022, a total of 2,685,577 kWh/h will be offered in the only offering level for new technical capacities as dac with an allocation restriction.

For the period 1 October 2022 to 1 October 2044, a total of 2,387,180 kWh/h will be offered in the only offering level for new technical capacities as dac with an allocation restriction.

Network point ENTRY GCP GAZ-SYSTEM/ONTRAS

Transmission system operator: ONTRAS Gastransport GmbH

Degree of capacity allocation: 30%

For the period 1 October 2019 to 1 October 2022, a total of 2,646,000 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

For the period 1 October 2022 to 1 October 2032, a total of 2,352,000 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

Network point EXIT Deutschneudorf

Transmission system operator: ONTRAS Gastransport GmbH

Degree of capacity allocation: 100%

For the period 1 October 2019 to 1 October 2022, a total of 1,800,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point ENTRY Lubmin II or Mallnow.

For the period 1 October 2022 to 1 October 2022, a total of 1,600,000 kWh/h will be offered in the only offering level as dac with an allocation restriction at the network point ENTRY Lubmin II or Mallnow.

Network point EXIT GCP GAZ-SYSTEM/ONTRAS

Transmission system operator: ONTRAS Gastransport GmbH

Degree of capacity allocation: 30%

For the period 1 October 2019 – 1 October 2022, a total of 602,100 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

For the period 1 October 2022 – 1 October 2032, a total of 535,200 kWh/h will be offered in the only offering level as freely allocable capacity (fac).

New network point EXIT Deutschneudorf-EUGAL

Transmission system operator: GASCADE Gastransport GmbH

Offering level I

Degree of capacity allocation: 98%

For the period 1 October 2019 to 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2020 to 1 October 2022, a total of 38,182,199 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2022 to 1 October 2039, a total of 33,939,732 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

Offering level II

Degree of capacity allocation: 97%

For the period 1 October 2019 to 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2020 to 1 October 2022, a total of 39,982,199 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2022 to 1 October 2039, a total of 35,539,732 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

Offering level III

Degree of capacity allocation: 96%

For the period 1 October 2019 to 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2020 to 1 October 2022, a total of 41,971,199 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2022 to 1 October 2039, a total of 37,307,732 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

Offering level IV

Degree of capacity allocation: 96%

For the period 1 October 2019 to 1 October 2020, a total of 24,931,507 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2020 to 1 October 2022, a total of 44,711,879 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

For the period 1 October 2022 to 1 October 2039, a total of 39,743,892 kWh/h will be offered as dac with an allocation restriction at the network point ENTRY Lubmin II.

Network point EXIT Mallnow

Transmission system operator: GASCADE Gastransport

Offering level I

Degree of capacity allocation: 20%

For the period 1 October 2019 to 1 October 2022, a total of 3,859,200 kWh/h will be offered as fac;

For the period 1 October 2022 to 1 October 2032, a total of 3,430,400 kWh/h will be offered as fac.

Offering level II

Degree of capacity allocation: 30%

For the period 1 October 2019 to 1 October 2022, a total of 5,657,400 kWh/h will be offered as fac;

For the period 1 October 2022 to 1 October 2032, a total of 5,028,800 kWh/h will be offered as fac.

Offering level III

Degree of capacity allocation: 45%

For the period 1 October 2019 to 1 October 2022, a total of 12,592,800 kWh/h will be offered as fac;

For the period 1 October 2022 to 1 October 2032, a total of 11,193,600 kWh/h will be offered as fac.

Zone EXIT Oude Statenzijl H

Transmission system operator: Gasunie Deutschland Transport Services GmbH

Degree of capacity allocation: 15%

For the period 1 October 2019 to 1 October 2022, a total of 10,800,000 kWh/h will be offered in the only offering level as freely allocable capacity (fac).